Construction of drilling basins and access roads to the Tabnak Gas Field (EC4)
سه شنبه 20 خرداد 1404
بازدید: 20
Construction of 5 drilling pits and 25 kilometers of access roads to sites O, U, P, Z2, and Site 5 in the Tabnak Gas Field (EC4)
- Rehabilitation and improvement of existing roads
- Excavation and embankment works
- Leveling and technical structures
- Fire pits, water and mud pits, and helicopter pads
- 25 kilometers of 4-inch water pipelines
- Gas pipelines and camp site preparation
Construction of 10 drilling pits and 50 kilometers of access roads in the Tabnak Gas Field
- Excavation and embankment works
- Leveling and technical structures
- Fire pits, water and mud pits, and helicopter pads