Construction of drilling basins and access roads to the Tabnak Gas Field (EC4)
    
بازدید: 20
    

Construction of 5 drilling pits and 25 kilometers of access roads to sites O, U, P, Z2, and Site 5 in the Tabnak Gas Field (EC4)

  • Rehabilitation and improvement of existing roads
  • Excavation and embankment works
  • Leveling and technical structures
  • Fire pits, water and mud pits, and helicopter pads
  • 25 kilometers of 4-inch water pipelines
  • Gas pipelines and camp site preparation

  

Construction of 10 drilling pits and 50 kilometers of access roads in the Tabnak Gas Field

  • Excavation and embankment works
  • Leveling and technical structures
  • Fire pits, water and mud pits, and helicopter pads