Execution of polyethylene and steel gas supply projects through the supply of goods, equipment, and installation (PC) in gas supply areas 1 and 4 in Shiraz and its suburbs
سه شنبه 20 خرداد 1404
بازدید: 19
Execution of 22,004 meters of gas supply project at 60 PSI pressure
Steel pipeline installation (2 to 10 inches, 2,004 meters)
Polyethylene pipeline installation (63 to 160 mm, 20,000 meters)
- 607 steel pipe welds
- 2,004 meters of pipe cleaning, priming, and insulation
- 22,300 meters of trench excavation in non-rocky terrain
The project was completed in 360 days.